Difference between revisions of "Mar 11, 2010 Readout"
From GlueXWiki
(→Items for followup from previous meeting) |
(→Tentative Agenda) |
||
Line 30: | Line 30: | ||
# Simulation runs | # Simulation runs | ||
# Geometry | # Geometry | ||
− | # SiPM - | + | # SiPM - Radiation test in Hall A (Yi) |
+ | # SiPM - Testing (Fernando) | ||
+ | #* Planning | ||
+ | #* Test station development with measurement parameters | ||
+ | #* Review & acceptance of test station | ||
+ | #* Preliminary verification tests & analysis of test station | ||
+ | #* Fabrication of two additional test stations for UR and JLab | ||
+ | #* Responsibilties | ||
+ | # SiPM - production testing (Fernando) | ||
+ | #* Schedules | ||
# Light guides | # Light guides | ||
= Minutes = | = Minutes = | ||
Attending: | Attending: |
Revision as of 09:07, 11 March 2010
Teleconference Time: 11:00 a.m. EST
- ESNET and EVO session
- Phone in CC F326 is 757-269-6337
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 77438230# (remember the "#"). Phone connection only upon request.
Contents
Items for followup from previous meeting
-
Check with Hall B regarding U. of Washington neutron detectors (Elton).Neutron detectors were returned to UofW. - Input/Decisions needed to finalize Bcal readout requirements (See also GlueX-doc-1373).
- Specify the normalization and dynamic range for the number of photons/GeV in showers (Andrei to summarize MC results)
- charged particles should also be included into the evaluation
-
Decide on specific grouping for SiPM sumsWill do this on output of generated showers -
Possibility of using air gap for SiPM coupling to light guide (Elton to write up results) -
Finalize shapes of "Winston guides"Basic information in GlueX-doc-1432.
- Specify the normalization and dynamic range for the number of photons/GeV in showers (Andrei to summarize MC results)
Documents to Review
- See GlueX-doc-1300 Evaluation of Bcal Readout Options
- See GlueX-doc-1301 Energy Resolution and Output Signals Simulation for Detailed-Structure BCAL Module Model
Tentative Agenda
- Announcements
- Review of Action Items
- Update - USM
- Simulation runs
- Geometry
- SiPM - Radiation test in Hall A (Yi)
- SiPM - Testing (Fernando)
- Planning
- Test station development with measurement parameters
- Review & acceptance of test station
- Preliminary verification tests & analysis of test station
- Fabrication of two additional test stations for UR and JLab
- Responsibilties
- SiPM - production testing (Fernando)
- Schedules
- Light guides
Minutes
Attending: