Line 14: | Line 14: | ||
# Wire frame update | # Wire frame update | ||
#* PCB status | #* PCB status | ||
− | #* wire sample measurements | + | #* wire sample measurements [http://www.jlab.org/Hall-D/detector/fdc/new_reports/ wire sample reports] |
# Cathode frame redesign | # Cathode frame redesign | ||
#* cathode redesign status | #* cathode redesign status | ||
Line 63: | Line 63: | ||
==Construction Updates== | ==Construction Updates== | ||
- The sense wire SEM checks are now complete and the wire sample reports | - The sense wire SEM checks are now complete and the wire sample reports | ||
− | have been posted on the FDC [http://www.jlab.org/Hall-D/detector/fdc/ | + | have been posted on the FDC [http://www.jlab.org/Hall-D/detector/fdc/new_reports/ Wire sample reports]. |
- The original document for the [http://www.jlab.org/Hall-D/detector/fdc/design/phase3_work.pdf Phase 3 Preparation Work] will be reviewed | - The original document for the [http://www.jlab.org/Hall-D/detector/fdc/design/phase3_work.pdf Phase 3 Preparation Work] will be reviewed |
Revision as of 18:18, 17 March 2010
March 18, 2010 FDC meeting
Tentative Agenda
- FDC production
- production space update
- FDC procurement plans
- Full scale prototype tests
- prototype test updates
- HV tests
- frame modification work: cathode sandwich and wire frame
- plans for layer 3
- Wire frame update
- PCB status
- wire sample measurements wire sample reports
- Cathode frame redesign
- cathode redesign status
- rigid-flex assembly
- Wire winding
- IUCF phase 3 contract
- plans for wire winding upgrades
- tension specs
- Other
- FDC naming convention
- ...