Difference between revisions of "BLTWG Meeting 04/19/2010"
From GlueXWiki
(→Agenda) |
|||
Line 7: | Line 7: | ||
# <i>postponed</i> -- Instrumentation options for the pair spectrometer -- ''Liping'' | # <i>postponed</i> -- Instrumentation options for the pair spectrometer -- ''Liping'' | ||
# Status of final design specifications for the tagger -- ''Tim'' | # Status of final design specifications for the tagger -- ''Tim'' | ||
− | # Creating magnetic field tables from ANSYS -- ''Alex'' | + | # [http://www.jlab.org/~somov/magnet_check.txt Creating magnetic field tables from ANSYS] -- ''Alex'' |
# Progress on diamond procurement, laser ablation -- ''Richard'' | # Progress on diamond procurement, laser ablation -- ''Richard'' | ||
# Incorporating cable attenuation into tagger rate study -- ''Richard'' | # Incorporating cable attenuation into tagger rate study -- ''Richard'' |
Latest revision as of 11:15, 19 April 2010
- Time: 11:00 EST
- Place: ESNET and EVO (with telephone bridge)
- Connecting: instructions are here
- Present: Igor S., Alex S., James M, Richard J., Tim W., and Yi
Agenda
- postponed -- Instrumentation options for the pair spectrometer -- Liping
- Status of final design specifications for the tagger -- Tim
- Creating magnetic field tables from ANSYS -- Alex
- Progress on diamond procurement, laser ablation -- Richard
- Incorporating cable attenuation into tagger rate study -- Richard
- Beam test planning -- Igor