Difference between revisions of "Minutes-4-22-2010"
From GlueXWiki
Line 8: | Line 8: | ||
#* off-site production space planning | #* off-site production space planning | ||
# Updates on: | # Updates on: | ||
− | #* Electronics: | + | #* Electronics: PCB, cable procurement status (Fernando) |
#* Cathode redesign (Bill, Roger) | #* Cathode redesign (Bill, Roger) | ||
− | #* | + | #* FDC cabling [http://www.jlab.org/Hall-D/detector/fdc/drawings/cabling/ cabling](Bill) |
− | # Full scale prototype | + | # Full scale prototype |
− | #* | + | #* status (Lubomir) |
− | #* | + | #* grounding problems (Fernando) |
+ | #* cosmics tests (Beni) | ||
# Other | # Other | ||
Revision as of 20:19, 21 April 2010
April 15, 2010 FDC meeting
Tentative Agenda
- Production
- UVA wire stringing equipment (Brian) pin rail2, pin rail, pos meas cam, pos meas , pos meas parts, pretension screw, string table
- off-site production space planning
- Updates on:
- Electronics: PCB, cable procurement status (Fernando)
- Cathode redesign (Bill, Roger)
- FDC cabling cabling(Bill)
- Full scale prototype
- status (Lubomir)
- grounding problems (Fernando)
- cosmics tests (Beni)
- Other