Difference between revisions of "Minutes-4-22-2010"
From GlueXWiki
Line 11: | Line 11: | ||
#* Cathode redesign (Bill, Roger) | #* Cathode redesign (Bill, Roger) | ||
#* FDC [http://www.jlab.org/Hall-D/detector/fdc/drawings/cabling/ cabling](Bill) | #* FDC [http://www.jlab.org/Hall-D/detector/fdc/drawings/cabling/ cabling](Bill) | ||
− | # Full scale prototype | + | # Full-scale prototype |
#* status (Lubomir) | #* status (Lubomir) | ||
#* grounding problems (Fernando) | #* grounding problems (Fernando) |
Revision as of 20:21, 21 April 2010
April 15, 2010 FDC meeting
Tentative Agenda
- Production
- UVA wire stringing equipment (Brian): pin rail2, pin rail, pos meas cam, pos meas , pos meas parts, pretension screw, string table
- off-site production space planning
- Updates on:
- Electronics: PCB, cable procurement status (Fernando)
- Cathode redesign (Bill, Roger)
- FDC cabling(Bill)
- Full-scale prototype
- status (Lubomir)
- grounding problems (Fernando)
- cosmics tests (Beni)
- Other