Difference between revisions of "Coil Test Weekly Meeting 6-May-2010"

From GlueXWiki
Jump to: navigation, search
m
 
m
Line 11: Line 11:
 
* Safety review - OSP and COO - Elliott, Josh, Tim
 
* Safety review - OSP and COO - Elliott, Josh, Tim
 
** subject matter experts
 
** subject matter experts
** what drawings are needed - final P&I, etc.
+
** what drawings are needed - final P&I, wiring diagrams, etc.
 
** what documents are needed - writing assignments
 
** what documents are needed - writing assignments
** next meeting with Bob May and co.
+
** next meeting with Bob May et al.
* Controller review and final equipment order - Elliott
+
* Review of instrumentation controllers and final controls equipment order - Elliott
 
* Failure analysis and machine protection - Scot, Mark S, Josh, Elliott
 
* Failure analysis and machine protection - Scot, Mark S, Josh, Elliott
 
* Wiring and testing controls racks - Scot, Mark S
 
* Wiring and testing controls racks - Scot, Mark S
** Moving PLC from ARC 101 to F117 for testing
+
** "cheater boxes"
** when do we need the hole in the wall?
+
** When to moving PLC from ARC 101 to F117 for testing
 
* Status of PLC programming - Mark W
 
* Status of PLC programming - Mark W
 
** Lakeshore calibrations
 
** Lakeshore calibrations
* HMI and EWEB programming, UPS, terminal server, etc. - Yi, Elliott
+
* HMI and EWEB programming - Yi, Elliott
 
** Status of developing display pages and archiving
 
** Status of developing display pages and archiving
 
* EPICS connection to PLC - Elliott, Wesley
 
* EPICS connection to PLC - Elliott, Wesley

Revision as of 09:58, 4 May 2010

Solenoid Coil Test Weekly Meeting

Location and Time

  • Thu 6-May-2010 9:30am ARC 428


Agenda

  • Safety review - OSP and COO - Elliott, Josh, Tim
    • subject matter experts
    • what drawings are needed - final P&I, wiring diagrams, etc.
    • what documents are needed - writing assignments
    • next meeting with Bob May et al.
  • Review of instrumentation controllers and final controls equipment order - Elliott
  • Failure analysis and machine protection - Scot, Mark S, Josh, Elliott
  • Wiring and testing controls racks - Scot, Mark S
    • "cheater boxes"
    • When to moving PLC from ARC 101 to F117 for testing
  • Status of PLC programming - Mark W
    • Lakeshore calibrations
  • HMI and EWEB programming - Yi, Elliott
    • Status of developing display pages and archiving
  • EPICS connection to PLC - Elliott, Wesley
  • Installation progress - George
  • Coil 1 status - George
  • Coil 2 status - George
  • Coil 3 repairs at IUCF - George