Difference between revisions of "Minutes-8-19-2010"
From GlueXWiki
Line 6: | Line 6: | ||
#* clean room requirement changes: [http://www.jlab.org/Hall-D/detector/fdc/production/clean_room_specs.txt Ron Bartek's suggestions] | #* clean room requirement changes: [http://www.jlab.org/Hall-D/detector/fdc/production/clean_room_specs.txt Ron Bartek's suggestions] | ||
#* equipment/materials needed for the production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Material_List.xlsx David's list] | #* equipment/materials needed for the production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Material_List.xlsx David's list] | ||
− | # Electronics: update (Fernando) | + | # Electronics: update (Fernando) |
# Engineering | # Engineering | ||
− | #* Cathode foil: sole source procurement status (Roger) | + | #* Cathode foil: sole source procurement status (Roger) [http://www.jlab.org/Hall-D/detector/fdc/documents/PD_14_Sole_Source_Justification.docx form], [http://www.jlab.org/Hall-D/detector/fdc/documents/PCB_PR294196_Flood-Sole_Source_Questions_8-11-10.docx PR 294196 questions] |
#* Wire stringing update (Bill) | #* Wire stringing update (Bill) | ||
# Full-scale prototype tests: update (Beni) | # Full-scale prototype tests: update (Beni) |
Revision as of 18:16, 17 August 2010
August 5, 2010 FDC meeting
Tentative Agenda
- Production
- clean room requirement changes: Ron Bartek's suggestions
- equipment/materials needed for the production David's list
- Electronics: update (Fernando)
- Engineering
- Cathode foil: sole source procurement status (Roger) form, PR 294196 questions
- Wire stringing update (Bill)
- Full-scale prototype tests: update (Beni)
- Other: talks at the collaboration meeting