Difference between revisions of "Minutes-10-21-2010"
From GlueXWiki
Line 14: | Line 14: | ||
#* Gluing and soldering materials | #* Gluing and soldering materials | ||
# Full-scale prototype tests (Lubomir) | # Full-scale prototype tests (Lubomir) | ||
− | #* gas mixture studies | + | #* gas mixture studies [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, page 526] |
# Other | # Other | ||
Revision as of 17:03, 20 October 2010
October 21, 2010 FDC meeting
Tentative Agenda
- Production (David)
- Electronics (Fernando, Chris, Roger)
- Update on PCBs
- Cathode foil and rigid-flex procurement
- Engineering (Bill, David)
- Wire stringing
- Gluing and soldering materials
- Full-scale prototype tests (Lubomir)
- gas mixture studies FDC Log Book, page 526
- Other