Difference between revisions of "Dec 9, 2010 Calorimetry"
From GlueXWiki
(→Tentative Agenda) |
(→Items for followup from previous meeting(s)) |
||
Line 19: | Line 19: | ||
# Fcal construction | # Fcal construction | ||
#* Matt to provide optimum schedule for shipping completed blocks to JLab based on technician work plan. | #* Matt to provide optimum schedule for shipping completed blocks to JLab based on technician work plan. | ||
− | #* Lubomir to provide references on radiation damage of lead glass. | + | #* <strike> Lubomir to provide references on radiation damage of lead glass.</strike> |
#* JLab decide on disposition of Fcal cables to free up space at IU. | #* JLab decide on disposition of Fcal cables to free up space at IU. | ||
# SiPMs | # SiPMs |
Revision as of 15:48, 8 December 2010
Teleconference Time: 10:30 a.m. EST
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- JLab Phone: in CC F326 is 757-269-6337
- Regina Phone: in LB228 is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
- Phone only if requested:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 77438230# (remember the "#"). Phone line by request only.
Items for followup from previous meeting(s)
- Monitoring
- Specifications for BCAL Monitoring R&D (Zisis, Elton, Christina)
- IU will provide mechanical drawings to Athens to help design attachment and connection points.
- IU: checking cross talk of calibration inputs across modules.
- Fcal construction
- Matt to provide optimum schedule for shipping completed blocks to JLab based on technician work plan.
-
Lubomir to provide references on radiation damage of lead glass. - JLab decide on disposition of Fcal cables to free up space at IU.
- SiPMs
- IU: simulation using geometry for summed units
Tentative Agenda
- Calibration
- Calibration/Monitoring minutes: Oct 26, 2010 Calibration/Monitoring
- GlueX-doc-1640 Update on Fcal monitoring (Athens)
- Requirements for Bcal monitoring : Calibration Specifications Table for BCAL, FCAL, TOF and START (Elton, Zisis and Christina)
- Announcements
- Review of Action Items
- FCAL
- Construction Status
- Rad Hard Insert - GlueX-doc-1641 Update on Damage Analysis
- BCAL
- Construction Status
- Readout segmentation
- Simulations
- Other Updates