Difference between revisions of "Jan 13, 2011 Readout"
From GlueXWiki
m (Jan 10, 2011 Readout moved to Jan 13, 2011 Readout: Wrong date) |
(→Tentative Agenda) |
||
Line 26: | Line 26: | ||
# Review of Action Items | # Review of Action Items | ||
# Update - USM | # Update - USM | ||
+ | #* SiPM test station (Alam) | ||
+ | #* Light guide fabrication (Iñaki) | ||
# SiPM update | # SiPM update | ||
#* Preparations for testing | #* Preparations for testing | ||
#* Regina preparations | #* Regina preparations | ||
+ | # Simulations | ||
+ | #* Granularity (Dan) | ||
# Electronics/cooling (Fernando) | # Electronics/cooling (Fernando) | ||
# Geometry and light guides | # Geometry and light guides |
Revision as of 09:04, 12 January 2011
Teleconference Time: 10:30 a.m. EST
- ESNET 8542553 and EVO session
- JLab Phone: in CC F326 is 757-269-6337 (usual room)
- JLab Phone in CC L207 is 757-269-7084
- Phone in the Regina Videoconference Suite is 306-585-4204
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 77438230# (remember the "#"). Phone connection only upon request.
Contents
Items for followup from previous meeting
- Collect this information of testing (including goals and setup) on the wiki for ease of presenting information. (USM)
- Resolution including summing SiPMs (IU)
- Detailed schedule for testing at USM (Elton and Will).
- George to send Elton information regarding the laser head so a new one can be ordered.
- JLab to ship a SiPM Array to USM. Electronics and sensor to be shipped in Jan.
Documents to Review
Tentative Agenda
- Announcements
- Review of Action Items
- Update - USM
- SiPM test station (Alam)
- Light guide fabrication (Iñaki)
- SiPM update
- Preparations for testing
- Regina preparations
- Simulations
- Granularity (Dan)
- Electronics/cooling (Fernando)
- Geometry and light guides
Minutes
Attending: