Difference between revisions of "Jan 25, 2011 Calibration/Monitoring"
From GlueXWiki
(→Background information) |
(→Background information) |
||
Line 7: | Line 7: | ||
*[[Monitoring R&D]] issues for the relative gain calibration and monitoring system for the calorimeters and possibly other detector systems. | *[[Monitoring R&D]] issues for the relative gain calibration and monitoring system for the calorimeters and possibly other detector systems. | ||
*[http://www.jlab.org/Hall-D/software/wiki/index.php/Sep_2%2C_2008_Calorimetry#Calibration_Specifications_Table Calibration Specifications Table] for BCAL, FCAL, TOF and START | *[http://www.jlab.org/Hall-D/software/wiki/index.php/Sep_2%2C_2008_Calorimetry#Calibration_Specifications_Table Calibration Specifications Table] for BCAL, FCAL, TOF and START | ||
− | * [[Calibration and Monitoring System Meetings | + | * [[Calibration and Monitoring System Meetings]] Previous minutes |
= Action Items = | = Action Items = |
Revision as of 12:42, 24 January 2011
Teleconference Time: 09:00 CST (Regina) / 10:00 EST / 17:00 GMT+2 (Athens)
- ESNET preferred, EVO as a backup
Background information
- Monitoring R&D issues for the relative gain calibration and monitoring system for the calorimeters and possibly other detector systems.
- Calibration Specifications Table for BCAL, FCAL, TOF and START
- Calibration and Monitoring System Meetings Previous minutes
Action Items
- Consider dual level settings on LEDs, one to fire near SiPM, the other to fire the far pmt (perhaps overflowing the near SiPM)
- Give (approximate) power consumption for LED calibration board
- Ask George if dynamic range plot for points on LED plot were due to intrinsic limitations.
Tentative Agenda
- Review goals/objectives of Monitoring system and past discussions.
- George Voulgaris' slides: Media:AnswersaboutLED.pdf
- Discuss Matt's suggestion: groove in light guides, radial fibres. (sent as email)
- Summarize info, prepare recommendations and discuss it in Working Group to reach conclusion and proceed with Athens Construction MOU (decision by May 2011).
Minutes
Attendees: Christina (Athens), Elton (JLab), Zisis (Regina)