Difference between revisions of "FDC Construction Details"
From GlueXWiki
Line 18: | Line 18: | ||
These documents contain all steps involved in the wire stringing including tension measurements. | These documents contain all steps involved in the wire stringing including tension measurements. | ||
− | ===== Cathode | + | ===== Cathode Foil Construction ===== |
− | These documents contain all steps | + | These documents contain all steps in the fabrication of the cathode foil to be glued onto the cathode frame. |
− | ===== Cathode | + | ===== Cathode Plane Construction ===== |
− | These documents contain all steps in | + | These documents contain all steps involved in the cathode plen construction including critical steps like soldering the rigid flex foils and gluing the ground plane. |
===== Stack Assembly ===== | ===== Stack Assembly ===== | ||
These documents contain all steps involved to assemble the FDC package. | These documents contain all steps involved to assemble the FDC package. |
Revision as of 16:46, 2 March 2011
Contents
The GlueX FDC
Overview
Construction
Details of the CDC Construction
Introduction
Global documents
Wire Frame Construction
These documents contain all steps involved to build the wire frame including the steps after stringing.
Wire Stringing
These documents contain all steps involved in the wire stringing including tension measurements.
Cathode Foil Construction
These documents contain all steps in the fabrication of the cathode foil to be glued onto the cathode frame.
Cathode Plane Construction
These documents contain all steps involved in the cathode plen construction including critical steps like soldering the rigid flex foils and gluing the ground plane.
Stack Assembly
These documents contain all steps involved to assemble the FDC package.