Difference between revisions of "Minutes-3-10-2011"

From GlueXWiki
Jump to: navigation, search
Line 28: Line 28:
 
- Dave: Today Mark Stevens and Brian Kross were at Blue Crab explaining how to cut the cathode foil. Two cuts were made using bad foils. Tomorrow they will continue with the foil gluing procedure. All the frames were inspected for mechanical tolerances. Two wire frames (out of 31) were out of specs. In one of them the o-ring groove was too deep and Bill wanted to refurbish it. The test PCB ring is ready to be laminated to the wire frame; the tooling for that is ready, as well.
 
- Dave: Today Mark Stevens and Brian Kross were at Blue Crab explaining how to cut the cathode foil. Two cuts were made using bad foils. Tomorrow they will continue with the foil gluing procedure. All the frames were inspected for mechanical tolerances. Two wire frames (out of 31) were out of specs. In one of them the o-ring groove was too deep and Bill wanted to refurbish it. The test PCB ring is ready to be laminated to the wire frame; the tooling for that is ready, as well.
  
- The readiness review will be on March 31 with Howard Fenker, Eugene Chudakov, Tim Whitlatch, Bruce Lenser, and Brian Kross in the review committee.  
+
- The readiness review will be on March 31 with Howard Fenker, Eugene Chudakov, Tim Whitlatch, Bruce Lenser, and Brian Kross in the review committee. Bruce wanted to have couple of weeks in advance: the specifications, drawings, and the QA plan. Bill have the assembly drawings ready by the next meeting. Dave has the QA documents. It was not clear what kind of specifications was he interested in; Eugene will talk to Bruce about that.  
 
+
   
- Beni created a web page (linked above) for the readiness review. The first part contains a checklist for the review. Eugene commented on the recovery procedures that they have to be in parallel with the acceptance tests. Beni: since we can't anticipate all the problems there must be also a common part explaining in general what we should do in case of unexpected problems. Lubomir: regarding the package assembling and package testing we don't have clear procedures yet. The testing will depend on the results from the first new design chamber. The idea is to build first one chamber with two end windows, to mount it to empty cathode/spacer frames as if it is in the package and to test it. Eugene: the review will be for the production only up to the point of the package assembling. Later we will add the documents for the rest of the procedures.   
+
  
 
== Electronics ==
 
== Electronics ==

Revision as of 19:12, 10 March 2011

March 10, 2011 FDC meeting

Agenda

  1. Production
    • Production status (David)
    • Readiness review program (Lubomir, Dave, Bill)
  2. Electronics
    • Status (Fernando, Chris)
    • Foil production (Roger)
    • Other
  3. Engineering (Bill, David)
    • Conductive tape soldering
    • New mounting template
    • Other
  4. Chamber testing
    • "Upside-down" tests (Lubomir)
  5. Other