Difference between revisions of "Apr 26, 2011 Calorimetry"
From GlueXWiki
(→Tentative Agenda) |
(→Items for followup from previous meeting(s)) |
||
Line 17: | Line 17: | ||
#* Need to study the reconstruction efficiency. | #* Need to study the reconstruction efficiency. | ||
#* <strike> Investigate timing resolution as it impacts delta_theta. Start with understanding of resolution at 90 deg. </strike> Ongoing studies. | #* <strike> Investigate timing resolution as it impacts delta_theta. Start with understanding of resolution at 90 deg. </strike> Ongoing studies. | ||
+ | #* Check timing resolution at 90 deg compared to beam test | ||
+ | #* Check inefficiencies compared to previous studies by Mihajlo. | ||
# SiPMs | # SiPMs | ||
#* Re-measure original SiPM sample to verify rates are in fact lower for new arrays | #* Re-measure original SiPM sample to verify rates are in fact lower for new arrays |
Revision as of 09:11, 13 April 2011
Teleconference Time: 11:00 a.m. EST
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- JLab Phone: in CC F326 is 757-269-6337
- Regina Phone: in LB228 is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
- Phone connection only upon request.
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#").
- or www.readytalk.com (and code without the #)
Items for followup from previous meeting(s)
- Monitoring
- Fcal: Review if cross talk experience from other detectors is relevant to this geometry and, if needed, suggest test/simulations to investigate.
- Simulation
- Need to study the reconstruction efficiency.
-
Investigate timing resolution as it impacts delta_theta. Start with understanding of resolution at 90 deg.Ongoing studies. - Check timing resolution at 90 deg compared to beam test
- Check inefficiencies compared to previous studies by Mihajlo.
- SiPMs
- Re-measure original SiPM sample to verify rates are in fact lower for new arrays
Tentative Agenda
- Announcements
- Review of Action Items
- Monitoring
- FCAL
- Construction Status: mechanical, bases
- BCAL
- Construction Status: builds, fibre QA
- First article testing (Yi)
- Simulations
- BCAL Segmentation (David)
Minutes
Attending: