Difference between revisions of "Apr 26, 2011 Calorimetry"
From GlueXWiki
(→Tentative Agenda) |
(→Tentative Agenda) |
||
Line 32: | Line 32: | ||
# BCAL | # BCAL | ||
## Construction Status: builds, fibre QA | ## Construction Status: builds, fibre QA | ||
− | # Collaboration Meeting Presentations | + | # [[GlueX-Collaboration-May-2011 | Collaboration Meeting Presentations]] |
# Simulations | # Simulations | ||
#* [[Media:20110412_bcal_segmentation.pdf|BCAL Segmentation]] (David) | #* [[Media:20110412_bcal_segmentation.pdf|BCAL Segmentation]] (David) |
Revision as of 08:35, 26 April 2011
Teleconference Time: 11:00 a.m. EST
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- JLab Phone: in CC F326 is 757-269-6337
- Regina Phone: in LB228 is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
- Phone connection only upon request.
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#").
- or www.readytalk.com (and code without the #)
Items for followup from previous meeting(s)
- Monitoring
- Fcal: Review if cross talk experience from other detectors is relevant to this geometry and, if needed, suggest test/simulations to investigate.
- Simulation
- Need to study the reconstruction efficiency.
-
Investigate timing resolution as it impacts delta_theta. Start with understanding of resolution at 90 deg.Ongoing studies. - Check timing resolution at 90 deg compared to beam test
- Check inefficiencies compared to previous studies by Mihajlo.
- SiPMs
- Re-measure original SiPM sample to verify rates are in fact lower for new arrays
Tentative Agenda
- Announcements
- Review of Action Items
- Monitoring
- FCAL
- Construction Status: mechanical, bases
- Photos of Base Testing
- BCAL
- Construction Status: builds, fibre QA
- Collaboration Meeting Presentations
- Simulations
- BCAL Segmentation (David)
- SiPM First Article (Yi)
- Timing and rate measurements of SiPMs (Baturin)
Minutes
Attending: