Difference between revisions of "Minutes-5-5-2011"
From GlueXWiki
Line 11: | Line 11: | ||
#* Rigid-flex stuffing | #* Rigid-flex stuffing | ||
# Engineering status (Bill) | # Engineering status (Bill) | ||
− | # Chamber testing | + | # Chamber testing (Beni) |
− | #* Pressure measurements | + | #* Equipment needed for Blue Crab |
+ | #* Pressure measurements | ||
# Other | # Other | ||
Revision as of 10:18, 5 May 2011
May 5, 2011 FDC meeting
Agenda
- Production
- Status (Dave)
- Wire position scanning (Lubomir)
- End window material (Bill)
- Electronics (Fernando, Chris)
- Status
- Rigid-flex stuffing
- Engineering status (Bill)
- Chamber testing (Beni)
- Equipment needed for Blue Crab
- Pressure measurements
- Other