Difference between revisions of "Minutes-5-5-2011"

From GlueXWiki
Jump to: navigation, search
Line 11: Line 11:
 
#* Rigid-flex stuffing
 
#* Rigid-flex stuffing
 
# Engineering status (Bill)
 
# Engineering status (Bill)
# Chamber testing
+
# Chamber testing (Beni)
#* Pressure measurements (Beni)
+
#* Equipment needed for Blue Crab
 +
#* Pressure measurements
 
# Other
 
# Other
  

Revision as of 10:18, 5 May 2011

May 5, 2011 FDC meeting

Agenda

  1. Production
    • Status (Dave)
    • Wire position scanning (Lubomir)
    • End window material (Bill)
  2. Electronics (Fernando, Chris)
    • Status
    • Rigid-flex stuffing
  3. Engineering status (Bill)
  4. Chamber testing (Beni)
    • Equipment needed for Blue Crab
    • Pressure measurements
  5. Other