# Check impact of material at low end of readout, both in the tubes for cooling fluid but also in the Cu cooling plate. Need to check effect on particle trajectories.
 
# Check impact of material at low end of readout, both in the tubes for cooling fluid but also in the Cu cooling plate. Need to check effect on particle trajectories.
 
# <strike> Suggested mods to mechanical: make SiPM holder one piece (instead of 4), increase thickness of holder to 3/16", increase length of heat spreader to cover all amplifiers. </strike>
 
# <strike> Suggested mods to mechanical: make SiPM holder one piece (instead of 4), increase thickness of holder to 3/16", increase length of heat spreader to cover all amplifiers. </strike>
# Check bowing with FEA
 
# PCB dummy power load for thermal test.
 
  
 
== Tentative Agenda ==
 
== Tentative Agenda ==
Line 24: Line 22:
  
 
== Minutes ==
 
== Minutes ==
''Attending:
+
''Attending: Jim, Jack, Elton, Carl, Yi, Fernando, John, Eugene
 +
 
 +
# Announcements
 +
# Action Items
 +
# Schedule, reporting, and manpower (Elton)
 +
# SiPM testing (Carl and Yi)
 +
# Mechanical (Jim)
 +
# Mechanical drawings (Chuck)
 +
# Geometry (Elton)
 +
# Temperature compensation (Jack)
 +
# Preamp-summing (Fernando)
 +
#*Fernando presented an overview of the grounding scheme for the readout, which has three grounds: a) amp/sum/bias ground, b) monitoring ground c) chassis.

Revision as of 17:56, 5 May 2011

References

Action Items from previous meetings

  1. Check impact of material at low end of readout, both in the tubes for cooling fluid but also in the Cu cooling plate. Need to check effect on particle trajectories.
  2. Suggested mods to mechanical: make SiPM holder one piece (instead of 4), increase thickness of holder to 3/16", increase length of heat spreader to cover all amplifiers.

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM testing (Carl and Yi)
  5. Mechanical (Jim)
  6. Mechanical drawings (Chuck)
  7. Geometry (Elton)
  8. Temperature compensation (Jack)
  9. Preamp-summing (Fernando)
    • Will present a discussion of cabling and grounding next week.

Minutes

Attending: Jim, Jack, Elton, Carl, Yi, Fernando, John, Eugene

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM testing (Carl and Yi)
  5. Mechanical (Jim)
  6. Mechanical drawings (Chuck)
  7. Geometry (Elton)
  8. Temperature compensation (Jack)
  9. Preamp-summing (Fernando)
    • Fernando presented an overview of the grounding scheme for the readout, which has three grounds: a) amp/sum/bias ground, b) monitoring ground c) chassis.