− | 1). Brian provided a CAD drawing for the full-scale plane | + | 1). Mechanical Drawings: |
+ | - Brian provided a CAD drawing for the full-scale plane | ||
tensioning system. Simon can use this in the FDC report that | tensioning system. Simon can use this in the FDC report that | ||
he is working on. | he is working on. | ||
− | + | - Brian is continuing to work on the FDC mechanical drawings. | |
− | + | ||
Things are progressing on the layout and frame design. We | Things are progressing on the layout and frame design. We | ||
are still several weeks away from mature drawings. A version | are still several weeks away from mature drawings. A version | ||
of these will be put into the FDC report for DOE. | of these will be put into the FDC report for DOE. | ||
− | + | 2). Ground Planes: | |
+ | - We discussed the idea of using sprayed on graphite or conducting | ||
ink for the FDC ground planes. Chris Cuevas has no real preference | ink for the FDC ground planes. Chris Cuevas has no real preference | ||
between these. This approach will eliminate 24 kapton layers for | between these. This approach will eliminate 24 kapton layers for | ||
the FDC system. The idea is to spray this directly onto the | the FDC system. The idea is to spray this directly onto the | ||
Rohacell. | Rohacell. | ||
− | + | - We raised the idea of using spray on conducting ink for the cathodes | |
− | + | ||
too. The local flatness is such that this cannot be used given | too. The local flatness is such that this cannot be used given | ||
our flatness tolerance according to Brian. | our flatness tolerance according to Brian. | ||
+ | - Brian will pursue getting a sample of conductive ink to do some | ||
+ | tests. | ||
− | + | 3). Design Issues: | |
+ | Brian is planning on using a ``tensile tube" system to limit | ||
compression of the FDC package so that the foam layers will not | compression of the FDC package so that the foam layers will not | ||
be compressed. | be compressed. | ||
− | + | 4). Rohacell: | |
+ | The Rohacell order has still not gone out due to delays in the | ||
12-GeV office. | 12-GeV office. | ||
− | + | 5). Monte Carlo: | |
+ | Simon is tuning up HDFAST to address material budget questions and | ||
thickness limitations for momentum resolution. | thickness limitations for momentum resolution. | ||
- kapton sheets = 50 microns | - kapton sheets = 50 microns | ||
Line 43: | Line 48: | ||
Curtis. | Curtis. | ||
− | + | 6). Gas System: | |
− | + | We briefly touched on the gas distribution system for the FDC | |
− | + | ||
− | + | ||
system and cooling needed for the on-chamber electronics. No | system and cooling needed for the on-chamber electronics. No | ||
real design or discussion yet on these two points. | real design or discussion yet on these two points. | ||
− | + | 7). Schedule: | |
− | + | Due to the upcoming BCAL test in Hall B, we will not have our | |
+ | next FDC meeting for several weeks. | ||
Minutes prepared by Daniel. Send any comments or corrections along. | Minutes prepared by Daniel. Send any comments or corrections along. |
Revision as of 09:39, 13 December 2006
FDC Weekly Meeting
Date: September 13, 2006
Participants: Daniel, Brian, Simon
Next Meeting: Wednesday, October 4, 2006 @ 1:30 p.m.
1). Mechanical Drawings:
- Brian provided a CAD drawing for the full-scale plane tensioning system. Simon can use this in the FDC report that he is working on. - Brian is continuing to work on the FDC mechanical drawings. Things are progressing on the layout and frame design. We are still several weeks away from mature drawings. A version of these will be put into the FDC report for DOE.
2). Ground Planes:
- We discussed the idea of using sprayed on graphite or conducting ink for the FDC ground planes. Chris Cuevas has no real preference between these. This approach will eliminate 24 kapton layers for the FDC system. The idea is to spray this directly onto the Rohacell. - We raised the idea of using spray on conducting ink for the cathodes too. The local flatness is such that this cannot be used given our flatness tolerance according to Brian. - Brian will pursue getting a sample of conductive ink to do some tests.
3). Design Issues:
Brian is planning on using a ``tensile tube" system to limit compression of the FDC package so that the foam layers will not be compressed.
4). Rohacell:
The Rohacell order has still not gone out due to delays in the 12-GeV office.
5). Monte Carlo:
Simon is tuning up HDFAST to address material budget questions and thickness limitations for momentum resolution. - kapton sheets = 50 microns - epoxy layers = 25 microns - Rohacell layers = 5 mm - Do calculations of dP/P vs. P, theta with and without the material. We can then discuss results with Elton and Curtis.
6). Gas System:
We briefly touched on the gas distribution system for the FDC system and cooling needed for the on-chamber electronics. No real design or discussion yet on these two points.
7). Schedule:
Due to the upcoming BCAL test in Hall B, we will not have our next FDC meeting for several weeks.