− | + | * '''Should we use ControlNet as well as Ethernet/IP in the hall?''' | |
− | * '''Notes''' | + | ** '''Notes''' |
− | ** Is there really a network reliability problem? | + | *** Is there really a network reliability problem? |
− | ** Would we have to run a copper line to the counting house? | + | *** Would we have to run a copper line to the counting house? |
− | ** Should we use an additional PLC in the hall? | + | *** Should we use an additional PLC in the hall? |
− | ** Should we locate the main PLC in the hall? | + | *** Should we locate the main PLC in the hall? |
− | * '''Resolution''' | + | ** '''Resolution''' |
− | ** Bryan and Brent say the high-class switches we will use in the hall are extremely reliable, as reliable as the PLC itself. | + | *** Bryan and Brent say the high-class switches we will use in the hall are extremely reliable, as reliable as the PLC itself. |
− | + | * '''When should we use a PC104 vs an IOC on a PC vs direct PLC control?''' | |
− | * '''Notes''' | + | ** '''Notes''' |
− | ** Should the FDC gas system use just PLC control and not use a PC104? | + | *** Should the FDC gas system use just PLC control and not use a PC104? |
Revision as of 12:02, 3 June 2011
- Should we use ControlNet as well as Ethernet/IP in the hall?
- Notes
- Is there really a network reliability problem?
- Would we have to run a copper line to the counting house?
- Should we use an additional PLC in the hall?
- Should we locate the main PLC in the hall?
- Resolution
- Bryan and Brent say the high-class switches we will use in the hall are extremely reliable, as reliable as the PLC itself.
- Notes
- When should we use a PC104 vs an IOC on a PC vs direct PLC control?
- Notes
- Should the FDC gas system use just PLC control and not use a PC104?
- Notes