Difference between revisions of "BCAL Readout Segmentation Task group Meeting: Jun 30, 2011"
From GlueXWiki
(→Review action items from previous meeting) |
|||
Line 13: | Line 13: | ||
=Agenda= | =Agenda= | ||
== Review action items from previous meeting == | == Review action items from previous meeting == | ||
− | * Reproduce Nshower plots but with dark hits disabled (Andrei) | + | * Reproduce [http://www.jlab.org/~semenov/fine-coarse-nShow-ndh.pdf Nshower plots but with dark hits disabled] (Irina / Andrei) |
− | * Send calibration scripts with instructions to David (Andrei) | + | * Send calibration scripts with instructions to David (Andrei: In progress but not finished yet) |
* Check on step size in X-Y plane and total step size to verify steps don't jump cells (David) | * Check on step size in X-Y plane and total step size to verify steps don't jump cells (David) | ||
* Check proton and neutron contribution to BCAL showers (David) | * Check proton and neutron contribution to BCAL showers (David) |
Revision as of 19:42, 29 June 2011
Contents
Meeting Info
Time:
- 11:30 JLab
- 9:30 Regina
Location:
- CC F326-327
Vid-con:
- ESNet 8542553
Agenda
Review action items from previous meeting
- Reproduce Nshower plots but with dark hits disabled (Irina / Andrei)
- Send calibration scripts with instructions to David (Andrei: In progress but not finished yet)
- Check on step size in X-Y plane and total step size to verify steps don't jump cells (David)
- Check proton and neutron contribution to BCAL showers (David)
- Continue signal timing distribution studies (David)
New Agenda items
- BCAL Signal Timing Distributions (David L.)
Minutes
Participants
TBD
Action Items
TBD