Difference between revisions of "Planning for bg MC production on the OSG"
From GlueXWiki
(→An example analysis) |
|||
Line 1: | Line 1: | ||
=== An example analysis === | === An example analysis === | ||
− | cross section | + | cross section 500 nb |
− | + | events per fit 20000 | |
+ | t bins 20 | ||
+ | mass bins 100 | ||
+ | total reconstructed 40000000 | ||
+ | reconst. efficiency 50% | ||
+ | fraction after cuts 10% | ||
+ | total xs events 800000000 | ||
+ | total g,p events 2E+11 | ||
+ | beam time (10^8) 10000000 s |
Revision as of 11:30, 1 August 2011
An example analysis
cross section 500 nb events per fit 20000 t bins 20 mass bins 100 total reconstructed 40000000 reconst. efficiency 50% fraction after cuts 10% total xs events 800000000 total g,p events 2E+11 beam time (10^8) 10000000 s