== Production ==
 
== Production ==
 +
 +
- During Irene the power was always on and the humidity and particle counts were OK on Monday.
  
 
- Dave: wire frame #6 is out of the stringing table and now working on #7: it was strung yesterday by Casey and Al in ~4 hours (record). Then the wires were taped and now doing position measurements. Aanatoly finished replacing the caps on frame #7. Cathodes: Tina and Mike tensioned type-1 cathode from set#7 and put the daughter cards on type-2 from set#6. Anatoly finished testing all the 80 foil sets. Wire frame #6 will be populated by Chris tomorrow and then (possibly on Monday) the central wires will be deadened.   
 
- Dave: wire frame #6 is out of the stringing table and now working on #7: it was strung yesterday by Casey and Al in ~4 hours (record). Then the wires were taped and now doing position measurements. Aanatoly finished replacing the caps on frame #7. Cathodes: Tina and Mike tensioned type-1 cathode from set#7 and put the daughter cards on type-2 from set#6. Anatoly finished testing all the 80 foil sets. Wire frame #6 will be populated by Chris tomorrow and then (possibly on Monday) the central wires will be deadened.   
Line 26: Line 28:
 
Eugene: it might be better  just to make new wire frames, but it has to be evaluated. Lubomir will collect more information for the next meeting what needs to be purchased to produce extra wire frames.  
 
Eugene: it might be better  just to make new wire frames, but it has to be evaluated. Lubomir will collect more information for the next meeting what needs to be purchased to produce extra wire frames.  
  
- HV caps problem: Chris  
+
- HV caps problem: Chris contacted the procurement and send a complaint letter with pictures to the company. The question is if we can ask the company about some sort of compensation if their product doesn't meet the technical requirements.  
 
+
- We will spend some time tomorrow preparing for the hurricane. The main problem we expect is the lack of electricity. Therefore, no gluing will be done tomorrow. Bill suggested to cover all the frames that are outside with vacuum bagging material.  
+
  
 
== Engineering ==
 
== Engineering ==

Revision as of 16:26, 1 September 2011

September 1, 2011 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Status
    • Package configurations
    • First package tests (Lubomir)
  2. Engineering update (Bill)
  3. Electronics update (Chris)
  4. Chamber testing at EEL126 (cell#2) (Beni, Lubomir)
  5. Other