Difference between revisions of "Minutes-11-3-2011"
From GlueXWiki
Line 39: | Line 39: | ||
== TDR == | == TDR == | ||
− | - There's "Tracking" section before the CDC and FDC detectors that Simon will look into it. However, mainly we will concentrate on the FDC description as a detector. | + | - There's "Tracking" section before the CDC and FDC detectors that Simon will look into it. However, mainly we will concentrate on the FDC description as a detector. After the meeting Lubomir, Simon, and Eugene discussed the FDC section in more details. |
--> | --> |
Revision as of 16:15, 2 November 2011
November 3, 2011 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Clean room status
- Production update
- First package tests (Lubomir)
- Engineering update (Bill)
- Electronics update (?)
- Testing set-up at EEL126 (Beni)
- TDR (Lubomir)
- Other