Difference between revisions of "Nov 17, 2011 SiPM Electrical and Cooling"

From GlueXWiki
Jump to: navigation, search
(Action Items from previous meetings)
(Action Items from previous meetings)
Line 4: Line 4:
 
# Check on status of shipping of bcal slices (Elton)
 
# Check on status of shipping of bcal slices (Elton)
 
# Elton to send monitoring specification to Jim.
 
# Elton to send monitoring specification to Jim.
 +
# Confirm the number of wires in the Fisher bias connector to the board. Jim will send Fernando the precise connector number.
  
 
== Tentative Agenda ==
 
== Tentative Agenda ==

Revision as of 08:45, 11 November 2011

Action Items from previous meetings

  1. Jack to update board with bias compensation circuitry (Jack)
  2. Check on status of shipping of bcal slices (Elton)
  3. Elton to send monitoring specification to Jim.
  4. Confirm the number of wires in the Fisher bias connector to the board. Jim will send Fernando the precise connector number.

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM production testing (everyone)
    1. Light source / optics
    2. Electronic boards
    3. Cabling
    4. Cooling plate
    5. Programming
    6. Other?
  5. SiPM testing (Ivan)
  6. Mechanical assembly (Scot)
  7. Mechanical (Jim)
  8. Mechanical drawings (Chuck)
  9. Temperature compensation (Jack)
  10. Preamp-summing (Fernando)

Minutes

Attending: