Line 77: | Line 77: | ||
'''Solenoid Controls Redesign''' | '''Solenoid Controls Redesign''' | ||
+ | |||
+ | * Jonathan and Rao produced a preliminary P&I diagram, need feedback from Scot et al. concerning controls wiring. | ||
+ | * Function of some valves has changed. | ||
+ | * Order for new vessel will go out soon. | ||
+ | * Mark will order (has ordered?) the shunt replacement. | ||
+ | * We still don't have a good strategy for coil tap signal isolation. | ||
+ | * We expect Giles will work on bringing UPS power to the hall, a 220V 30A subpanel seems reasonable. | ||
+ | * Still don't know the coil inductances, still working on alternative quench detectors. | ||
+ | * Mark will design the new ground fault detector using the existing dump resistor. | ||
+ | * FMEA will help determine the level of redundancy needed (contactor, QD, diodes, UPS power to power supply, etc). | ||
+ | * Yi tested the NI 8-chan (separate ADC for each channel) fast-daq board and is very happy. No crosstalk seen up to high sampling rates. | ||
+ | |||
+ | |||
+ | |||
+ | ''' |
Revision as of 15:41, 18 November 2011
Agenda
- Announcements
- FMEA for solenoid required by Lehman committee
- Need EE help?
- Minutes from previous meeting 20-Oct-2011
- Vendor show doomed the 3-Nov meeting
- Equipment orders - all
- Solenoid_Controls_Redesign - Mark, Josh, Scot, Cody, Yi, Elliott
- Preliminay P&I completed, cryo vessel to be ordered soon
- changes to cryo control system
- shunt replacement
- coil tap isolation, range and precision
- UPS power to Danfysik
- quench detector balance, new quench detector
- ground fault detector using dump resistor
- redundant Danfysik contactor, quench detector, dump diodes?
- fast DAQ replacement
- Experiment Control Supervisor - Vardan, Hovanes, Elliott
- use CSS?
- EPICS evaluation
- archiver
- alarm system
- backup/restore
- EPICS - Nerses, Hovanes, Elliott
- JLab discriminator
- directory structure
- Controls test stand - Hovanes, Josh
- SOE module
- 435NBX serial module
- EPICS drivers and gui's
- PLC programming, Viewpoint, licenses, etc. - Josh
- high-priority tasks
- add-on instructions -- ladder logic, function block, structured text
- Networking - Hovanes, Elliott
- UPS power in the hall - Elliott
- Elog - Elliott
- Midas
- manual database
- maintenance logs
- operator log?
- Midas
- Mantis task tracker
- PyIRMIS - Hovanes, Elliott
Time/Location
9:30 AM Thurs 17-Nov-2011 CC L207
Announcements
Next Meeting
Thurs 1-Dec-2011 9:30am CC L207
Minutes
Present: Elliott W, Josh B, Mark S.
Equipment Orders
- Mark still has to order rack parts.
- Mark will produce a desired equipment list in priority order.
- Josh has received everything he ordered (SOE, 435NBX, etc).
Solenoid Controls Redesign
- Jonathan and Rao produced a preliminary P&I diagram, need feedback from Scot et al. concerning controls wiring.
- Function of some valves has changed.
- Order for new vessel will go out soon.
- Mark will order (has ordered?) the shunt replacement.
- We still don't have a good strategy for coil tap signal isolation.
- We expect Giles will work on bringing UPS power to the hall, a 220V 30A subpanel seems reasonable.
- Still don't know the coil inductances, still working on alternative quench detectors.
- Mark will design the new ground fault detector using the existing dump resistor.
- FMEA will help determine the level of redundancy needed (contactor, QD, diodes, UPS power to power supply, etc).
- Yi tested the NI 8-chan (separate ADC for each channel) fast-daq board and is very happy. No crosstalk seen up to high sampling rates.