(Action Items from previous meetings)
(Action Items from previous meetings)
Line 5: Line 5:
 
# Determine if swapped bias pins was accidental or in design (Chris)
 
# Determine if swapped bias pins was accidental or in design (Chris)
 
# Modify design so that the samtek/ADC transition board the locking mechanism works (Chris)
 
# Modify design so that the samtek/ADC transition board the locking mechanism works (Chris)
 +
# Provide cost information to Chris regarding the thermistor (Jack)
  
 
== Tentative Agenda ==
 
== Tentative Agenda ==

Revision as of 18:39, 26 January 2012

Action Items from previous meetings

  1. Populate interface cards to the ADC (Chris)
  2. Complete 3 remaining boards for SiPM testing (Chris)
  3. Determine if swapped bias pins was accidental or in design (Chris)
  4. Modify design so that the samtek/ADC transition board the locking mechanism works (Chris)
  5. Provide cost information to Chris regarding the thermistor (Jack)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM production testing (everyone)
  5. Mechanical assembly (Scot)
  6. Mechanical (Jim)
  7. Mechanical drawings (Chuck)
  8. Temperature compensation (Jack)
  9. Preamp-summing (Fernando/Chris)
  10. SiPM testing (Ivan)

Minutes

Attending: