Difference between revisions of "Minutes-1-26-2012"
From GlueXWiki
Line 16: | Line 16: | ||
= Minutes = | = Minutes = | ||
− | Participants: Bill, Dave, Chris, Simon, Beni | + | Participants: Bill, Dave, Chris, Nick, Mark, Simon, Beni, and Lubomir. |
== Production == | == Production == | ||
− | - Dave: | + | - Dave: wire board #20 (first cell of the 3rd package) is ready for wire deadening; waiting for the microscope results from Olga to make sure the new timing/currents for electroplating is OK. |
− | + | ||
- Testing wire deadening with new diameter for the last two packages: Bill recalculated the currents/timing and one sample was made. It turned out the surface looks more rough that before (see microscope picture attached). Bill will add another electro-polishing cycle to smooth the surface and will try it on another sample. | - Testing wire deadening with new diameter for the last two packages: Bill recalculated the currents/timing and one sample was made. It turned out the surface looks more rough that before (see microscope picture attached). Bill will add another electro-polishing cycle to smooth the surface and will try it on another sample. | ||
Revision as of 18:43, 26 January 2012
January 26, 2012 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Production update
- First package status (Lubomir)
- Engineering update (Bill)
- Electronics update (Chris)
- LV cabling
- Testing in 126 (Beni)
- Other