Difference between revisions of "Feb 23, 2011 SiPM Electrical and Cooling"
From GlueXWiki
(→Tentative Agenda) |
(→Tentative Agenda) |
||
Line 12: | Line 12: | ||
# Schedule, reporting, and manpower (Elton) | # Schedule, reporting, and manpower (Elton) | ||
# SiPM production testing (everyone) | # SiPM production testing (everyone) | ||
+ | ## | ||
# Mechanical assembly (Scot) | # Mechanical assembly (Scot) | ||
# Mechanical (Jim) | # Mechanical (Jim) | ||
Line 21: | Line 22: | ||
#* I installed the additional 3 power cables to power the boards | #* I installed the additional 3 power cables to power the boards | ||
#* I built up 8 more of the Samtec to CAEN adapter boards and asked Jim F. to bring them to the meeting today. I am waiting on parts to finish the last 4. | #* I built up 8 more of the Samtec to CAEN adapter boards and asked Jim F. to bring them to the meeting today. I am waiting on parts to finish the last 4. | ||
− | |||
== Minutes == | == Minutes == | ||
''Attending: | ''Attending: |
Revision as of 18:22, 23 February 2012
Action Items from previous meetings
- Determine if swapped bias pins was accidental or in design (Chris)
- Make low voltage cables for the SiPM test (Chris)
- Acquire material to absorb water for the box (Carl)
- Order dew point sensor (Jim)
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM production testing (everyone)
- Mechanical assembly (Scot)
- Mechanical (Jim)
- Mechanical drawings (Chuck)
- Temperature compensation (Jack)
- Preamp-summing (Chris is out but sent these notes)
- The 80 U Boards will be delivered tomorrow and I have all the parts in house
- I have finished and tested the last 4-Up BCAL test boards and installed it in the test fixture in 126
- I installed the additional 3 power cables to power the boards
- I built up 8 more of the Samtec to CAEN adapter boards and asked Jim F. to bring them to the meeting today. I am waiting on parts to finish the last 4.
Minutes
Attending: