Difference between revisions of "Minutes-4-19-2012"

From GlueXWiki
Jump to: navigation, search
Line 8: Line 8:
 
#* Production status
 
#* Production status
 
# Engineering update (Bill)  
 
# Engineering update (Bill)  
#* Helium Drift Chamber [http://www.jlab.org/Hall-D/detector/fdc/design/Picture0002.png]
+
#* Helium Drift Chamber [http://www.jlab.org/Hall-D/detector/fdc/design/Picture0002.png], [http://www.jlab.org/Hall-D/detector/fdc/design/Picture0003.png], [http://www.jlab.org/Hall-D/detector/fdc/design/Picture0004.png], [http://www.jlab.org/Hall-D/detector/fdc/design/Picture0005.png], [http://www.jlab.org/Hall-D/detector/fdc/design/Picture00010.png]
 
# Electronics update (Chris)
 
# Electronics update (Chris)
 
# Tests with first package at 126 (Beni)
 
# Tests with first package at 126 (Beni)

Revision as of 11:52, 19 April 2012

April 19, 2012 FDC meeting

Agenda

  1. New results from the oxygen studies (Lubomir)
  2. Production Construction Tracking (Dave)
    • New procedures for package refurbishment
    • First production cell with Apiezon and Viton O-rings
    • Production status
  3. Engineering update (Bill)
  4. Electronics update (Chris)
  5. Tests with first package at 126 (Beni)
    • Grounding
  6. Other