Difference between revisions of "May 15, 2012 Readout"
From GlueXWiki
(→Tentative Agenda) |
(→Tentative Agenda) |
||
Line 29: | Line 29: | ||
# Talks at the [[GlueX-Collaboration-Jun-2012|Collaboration Meeting]] May 21-23 | # Talks at the [[GlueX-Collaboration-Jun-2012|Collaboration Meeting]] May 21-23 | ||
# Update from USM | # Update from USM | ||
− | ## [https://halldweb1.jlab.org/wiki/images/a/a5/USM_report_15.pdf Production manager report] | + | ## [https://halldweb1.jlab.org/wiki/images/a/a5/USM_report_15.pdf Production manager report (Javiera Quiroz] |
+ | ## A study of PDE from station 3 (Orlando Soto) | ||
## [http://atlasusr.fis.utfsm.cl:8000/ USM Web Interface to DB] | ## [http://atlasusr.fis.utfsm.cl:8000/ USM Web Interface to DB] | ||
# Status of Testing at JLab | # Status of Testing at JLab |
Revision as of 09:59, 15 May 2012
Teleconference Time: 11:00 a.m. EST
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- Phone connection only upon request.
- +1-866-740-1260 : US and Canada
- +1-303-248-0285 : International
- then use participant code: 3421244# (the # is needed when using the phone)
- OR from www.readytalk.com type access code 3421244 into "join a meeting" without the # (you need java plugin)
Contents
Participant Direct Lines
- JLab Phone: in CC F326 is 757-269-6337 (usual room)
- JLab Phone in CC L207 is 757-269-7084
- Phone in the Regina Videoconference Suite is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
Items for followup from previous meeting
-
Send drawings of light guide gauges to USM (Elton)sent e-mail yesterday - SiPMs
- Plot dark rate of SiPM measurements under the same conditions as for Hamamatsu for each of comparison (Orlando and Serguei)
Presentations from recent meetings
Tentative Agenda
- Announcements
- Review of Action Items
- Talks at the Collaboration Meeting May 21-23
- Update from USM
- Production manager report (Javiera Quiroz
- A study of PDE from station 3 (Orlando Soto)
- USM Web Interface to DB
- Status of Testing at JLab
- BCAL Beam Tests 2012
- Updates (Elton)
- Discussion of data and additional work needed
- Other
Minutes
Attending: