Difference between revisions of "Minutes-7-12-2012"
From GlueXWiki
(→Agenda) |
|||
Line 5: | Line 5: | ||
#* Fourth package tests | #* Fourth package tests | ||
#* Spare wire frames | #* Spare wire frames | ||
− | |||
#* Third package preparation | #* Third package preparation | ||
# Engineering update (Bill) | # Engineering update (Bill) | ||
#* Cooling system | #* Cooling system | ||
# Electronics update: PR for the spare PCBs, grounding, other (Chris, Nick) | # Electronics update: PR for the spare PCBs, grounding, other (Chris, Nick) | ||
− | # Gas system | + | # Gas system update (Beni) |
# Test set-up in 126 (Beni) | # Test set-up in 126 (Beni) | ||
# Other | # Other |
Revision as of 18:40, 11 July 2012
July 12, 2012 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Fourth package tests
- Spare wire frames
- Third package preparation
- Engineering update (Bill)
- Cooling system
- Electronics update: PR for the spare PCBs, grounding, other (Chris, Nick)
- Gas system update (Beni)
- Test set-up in 126 (Beni)
- Other