Difference between revisions of "Minutes-7-19-2012"
From GlueXWiki
Line 5: | Line 5: | ||
#* Fourth package status and spare wire frames (Lubomir, Vlad) | #* Fourth package status and spare wire frames (Lubomir, Vlad) | ||
#* Third package preparation | #* Third package preparation | ||
− | #* Grounding (Vlad) | + | #* Grounding scheme (Vlad) |
# Engineering (Bill) | # Engineering (Bill) | ||
# Electronics (Chris, Nick) | # Electronics (Chris, Nick) |
Revision as of 17:56, 18 July 2012
July 19, 2012 FDC meeting
Agenda
- Production (Dave)
- Fourth package status and spare wire frames (Lubomir, Vlad)
- Third package preparation
- Grounding scheme (Vlad)
- Engineering (Bill)
- Electronics (Chris, Nick)
- Gas system (Beni, Bill)
- Gas mixture compilation (Lubomir)
- Test set-up in 126 (Beni)
- Other