Difference between revisions of "Aug 9, 2011 SiPM Electrical and Cooling"
From GlueXWiki
(→Action Items from previous meetings) |
(→Action Items from previous meetings) |
||
Line 2: | Line 2: | ||
# Develop front and back views of jumper sheets. (Jack) | # Develop front and back views of jumper sheets. (Jack) | ||
+ | #* This specifically includes the settings for the pre-production boards that are needed by Wed of next week. | ||
# Test wrapping forms (Elton) | # Test wrapping forms (Elton) | ||
# Order glue (and any other consumables) to glue light guides (Scot) | # Order glue (and any other consumables) to glue light guides (Scot) |
Revision as of 17:32, 26 July 2012
Action Items from previous meetings
- Develop front and back views of jumper sheets. (Jack)
- This specifically includes the settings for the pre-production boards that are needed by Wed of next week.
- Test wrapping forms (Elton)
- Order glue (and any other consumables) to glue light guides (Scot)
- Check new gluing jig for the light guides (Scot and Jim)
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM production testing (everyone)
- SiPMs assignment for new boards
- Mechanical assembly (Jim)
- Temperature compensation (Jack)
- Electronic boards (Chris)
- Light guide gluing setup
Minutes
Attending: