# Temperature compensation (Jack) | # Temperature compensation (Jack) | ||
# Electronic boards (Chris) | # Electronic boards (Chris) | ||
− | # Light guide gluing setup | + | # Light guide gluing setup (Scot via e-mail) |
+ | #* I have completed the redesigned light guide "push" vacuum wand / base fabrication as of 1:30 p.m. today. | ||
+ | #* I ordered a 1 LB. bottle of Norland NOA 87 light guide UV adhesive on 08/17/2012 - PR # 321682 | ||
== Minutes == | == Minutes == | ||
''Attending: | ''Attending: |
Revision as of 14:34, 9 August 2012
Action Items from previous meetings
- Develop front and back views of jumper sheets. (Jack)
- This specifically includes the settings for the pre-production boards that are needed by Wed of next week.
- Test wrapping forms (Elton)
- Order glue (and any other consumables) to glue light guides (Scot)
- Check new gluing jig for the light guides (Scot and Jim)
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM production testing (everyone)
- SiPMs assignment for new boards
- Mechanical assembly (Jim)
- Temperature compensation (Jack)
- Electronic boards (Chris)
- Light guide gluing setup (Scot via e-mail)
- I have completed the redesigned light guide "push" vacuum wand / base fabrication as of 1:30 p.m. today.
- I ordered a 1 LB. bottle of Norland NOA 87 light guide UV adhesive on 08/17/2012 - PR # 321682