Difference between revisions of "Aug 16, 2011 SiPM Electrical and Cooling"
From GlueXWiki
(→Action Items from previous meetings) |
(→Action Items from previous meetings) |
||
Line 3: | Line 3: | ||
# Test wrapping forms (Elton) | # Test wrapping forms (Elton) | ||
# Decide on how to a store sorted SiPMs in preparation for installation (Fernando and Chris) | # Decide on how to a store sorted SiPMs in preparation for installation (Fernando and Chris) | ||
− | # Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando) | + | # Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)\ |
+ | # Review requirement of 2.5 reduced gain reduction (Elton) | ||
== Tentative Agenda == | == Tentative Agenda == |
Revision as of 18:39, 9 August 2012
Action Items from previous meetings
- Test wrapping forms (Elton)
- Decide on how to a store sorted SiPMs in preparation for installation (Fernando and Chris)
- Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)\
- Review requirement of 2.5 reduced gain reduction (Elton)
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM production testing (everyone)
- SiPMs assignment for new boards
- Mechanical assembly (Jim)
- Temperature compensation (Jack)
- Electronic boards (Chris)
- Light guide gluing setup (Scot via e-mail)
Minutes
Attending: