# Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)\
 
# Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)\
 
# Review requirement of 2.5 reduced gain reduction (Elton)
 
# Review requirement of 2.5 reduced gain reduction (Elton)
 +
#* See [https://cebaf.jlab.org/elog/entry/1787299 Log Entry with plots]
 +
#* See [https://mailman.jlab.org/pipermail/halld-cal/2012-May/000588.html e-mail with comments]
  
 
== Tentative Agenda ==
 
== Tentative Agenda ==

Revision as of 12:21, 16 August 2012

Action Items from previous meetings

  1. Test wrapping forms (Elton)
  2. Decide on how to a store sorted SiPMs in preparation for installation (Fernando and Chris)
  3. Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)\
  4. Review requirement of 2.5 reduced gain reduction (Elton)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM production testing (everyone)
    • SiPMs assignment for new boards
  5. Mechanical assembly (Jim)
  6. Temperature compensation (Jack)
  7. Electronic boards (Chris)
  8. Light guide gluing setup (Scot via e-mail)

Minutes

Attending: