Difference between revisions of "Aug 16, 2011 SiPM Electrical and Cooling"
From GlueXWiki
(→Action Items from previous meetings) |
(→Tentative Agenda) |
||
Line 13: | Line 13: | ||
# Action Items | # Action Items | ||
# Schedule, reporting, and manpower (Elton) | # Schedule, reporting, and manpower (Elton) | ||
− | # SiPM production testing ( | + | # SiPM production testing (Yi) |
− | + | ||
# Mechanical assembly (Jim) | # Mechanical assembly (Jim) | ||
# Temperature compensation (Jack) | # Temperature compensation (Jack) |
Revision as of 13:42, 16 August 2012
Action Items from previous meetings
- Test wrapping forms (Elton)
- Decide on how to a store sorted SiPMs in preparation for installation (Fernando and Chris)
- Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)\
- Review requirement of 2.5 reduced gain reduction (Elton)
- See Log Entry with plots or Log book See entry 1787299
- See e-mail with comments
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM production testing (Yi)
- Mechanical assembly (Jim)
- Temperature compensation (Jack)
- Electronic boards (Chris)
- Light guide gluing setup (Scot via e-mail)
Minutes
Attending: