# Test wrapping forms (Elton)
+
# <strike> Test wrapping forms (Elton) </strike> Tara and Elton used the pattern prepared by Jim and checked the fit. The pattern can be extended a couple of mm toward the narrow end of the light guide
# Decide on how to a store sorted SiPMs in preparation for installation (Fernando and Chris)
+
# <strike> Decide on how to a store sorted SiPMs in preparation for installation (Fernando and Chris) </strike> The Hamamatsu boxes will be reused.
# Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)\
+
# Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)
# Review requirement of 2.5 reduced gain reduction (Elton)
+
# <strike> Review requirement of 2.5 reduced gain reduction (Elton) </strike>
 
#* See [https://cebaf.jlab.org/elog/entry/1787299 Log Entry with plots] or  [https://cebaf.jlab.org/elog/elog.php?logbook=HDFCALTEST Log book] See entry 1787299
 
#* See [https://cebaf.jlab.org/elog/entry/1787299 Log Entry with plots] or  [https://cebaf.jlab.org/elog/elog.php?logbook=HDFCALTEST Log book] See entry 1787299
 
#* See [https://mailman.jlab.org/pipermail/halld-cal/2012-May/000588.html e-mail with comments]
 
#* See [https://mailman.jlab.org/pipermail/halld-cal/2012-May/000588.html e-mail with comments]
Line 21: Line 21:
 
== Minutes ==
 
== Minutes ==
 
''Attending:
 
''Attending:
 +
 +
# Announcements
 +
# Action Items
 +
# Schedule, reporting, and manpower (Elton)
 +
# SiPM production testing (Yi)
 +
# Mechanical assembly (Jim)
 +
# Temperature compensation (Jack)
 +
# Electronic boards (Chris)
 +
# Light guide gluing setup (Scot via e-mail)

Revision as of 16:39, 16 August 2012

Action Items from previous meetings

  1. Test wrapping forms (Elton) Tara and Elton used the pattern prepared by Jim and checked the fit. The pattern can be extended a couple of mm toward the narrow end of the light guide
  2. Decide on how to a store sorted SiPMs in preparation for installation (Fernando and Chris) The Hamamatsu boxes will be reused.
  3. Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)
  4. Review requirement of 2.5 reduced gain reduction (Elton)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM production testing (Yi)
  5. Mechanical assembly (Jim)
  6. Temperature compensation (Jack)
  7. Electronic boards (Chris)
  8. Light guide gluing setup (Scot via e-mail)

Minutes

Attending:

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM production testing (Yi)
  5. Mechanical assembly (Jim)
  6. Temperature compensation (Jack)
  7. Electronic boards (Chris)
  8. Light guide gluing setup (Scot via e-mail)