Difference between revisions of "Oct 18, 2011 SiPM Electrical and Cooling"
From GlueXWiki
m (moved Oct 11, 2011 SiPM Electrical and Cooling to Oct 18, 2011 SiPM Electrical and Cooling: change date for cancelled meeting) |
(→Tentative Agenda) |
||
Line 12: | Line 12: | ||
# Announcements | # Announcements | ||
# Action Items | # Action Items | ||
− | # Schedule | + | # Schedule for production and testing (everyone) |
# mini-Bcal (Elton) | # mini-Bcal (Elton) | ||
# SiPM production testing (Yi) | # SiPM production testing (Yi) | ||
Line 18: | Line 18: | ||
# Temperature compensation (Jack) | # Temperature compensation (Jack) | ||
# Electronic boards (Fernando and Chris) | # Electronic boards (Fernando and Chris) | ||
+ | #* U-board puller? | ||
# Light guide gluing setup (Scot) | # Light guide gluing setup (Scot) | ||
== Minutes == | == Minutes == | ||
''Attending: | ''Attending: |
Revision as of 11:17, 11 October 2012
Action Items from previous meetings
- Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)
- Work with Shaun to write up a procedure for substituting a sensor on one of the boards to be assembled. (Jack)
- Provide feedback to Fernando on his readout assembly schedule (Elton and Jim)
- Check uniformity of LED source in black testing box
- Make a metal die to punch holes in cooling mat to ease assembly. (Nick and Jim)
- Send P6 line numbers (and accounts) to Jim for purchase of the mechanical parts (Elton).
Tentative Agenda
- Announcements
- Action Items
- Schedule for production and testing (everyone)
- mini-Bcal (Elton)
- SiPM production testing (Yi)
- Mechanical assembly (Jim)
- Temperature compensation (Jack)
- Electronic boards (Fernando and Chris)
- U-board puller?
- Light guide gluing setup (Scot)
Minutes
Attending: