Difference between revisions of "Microscope Fabrication Readiness Review"
From GlueXWiki
Senderovich (Talk | contribs) (→Documents on the Microscope Construction) |
(→UConn) |
||
Line 14: | Line 14: | ||
* James McIntyre (graduate student) | * James McIntyre (graduate student) | ||
* Alex Barnes (undergraduate student) | * Alex Barnes (undergraduate student) | ||
+ | * Igor Senderovich (Post Doc Arizona State, former Uconn graduate student) | ||
=== JLab === | === JLab === |
Revision as of 14:03, 28 January 2013
Contents
Date and Time
February 7, 2013
Video Connection information if needed
- ESNET and EVO session
- Phone only if requested:
- +1-866-740-1260 : US
- access code: 3421244# (remember the "#"). Phone line by request only.
Participants
UConn
- Richard Jones (Professor of Physics)
- James McIntyre (graduate student)
- Alex Barnes (undergraduate student)
- Igor Senderovich (Post Doc Arizona State, former Uconn graduate student)
JLab
- Fernando Barbosa (Hall D eletrical engineer)
- Eugene Chudakov (Hall D group leader) [not confirmed]
- Hovanes Egiyan (Hall D Staff)
- Bruce Lenzer (JLab ESH&Q)
- Elton Smith (Hall D Staff)
- Alexander Somov (Hall D Staff, SOTR)
- Timothy Whitlatch (Hall D engineer)
- Igor Senderovich (ASU postdoc, formerly in UConn group)
Topics/Issues that need discussion/resolution
Documents on the Microscope Construction
- Drawings (wiki) Short list of updated drawings:
- Electronics (wiki)
- Microscope construction (wiki)
- Preparation for Construction: workshop space, instrumentation 1 (wiki)
- Construction instrumentation 2 (wiki)
Meeting Agenda
- Project Overview
- Scope of contract and current review
- Status of construction
- Tour of the Construction Facilities.
- Technical Documents Review. Topics to be covered in going through the documents include the following.
- Final Construction Plan
- Quality Assurance Plans and Acceptance Test Plans
- Testing procedures
- Documentations and Travelers
- Personnel training
- Schedule and Tracking
- Video meeting with Jlab and UConn Financial people.
- Billing and Reporting
- Continue Document Review (if needed).
- Closeout
- Adjourn