Difference between revisions of "GlueX Target Design Review, February 8, 2013"
From GlueXWiki
Line 3: | Line 3: | ||
==Agenda== | ==Agenda== | ||
− | *P&I Diagram [ | + | *P&I Diagram [[Media:Latest Target P&I.pdf]] |
+ | *Dave's SOW [[Media:Target SOW.pdf]] | ||
[https://halldweb1.jlab.org/talks/2012-1Q/Hall%20D%20Target%20Design%20Status,%20February%2022,%202012.pptx Jim's Presentation] | [https://halldweb1.jlab.org/talks/2012-1Q/Hall%20D%20Target%20Design%20Status,%20February%2022,%202012.pptx Jim's Presentation] | ||
Revision as of 08:29, 8 February 2013
Present: Dave Meekins, Jim Fochtman, Mark Ito, Chris Keith, Tim Whitlatch,
Agenda
- P&I Diagram Media:Latest Target P&I.pdf
- Dave's SOW Media:Target SOW.pdf
Notes
- Target volume of 0.4 l of liquid hydrogen expands to about 1000 l at STP.
- Hall B pumps on scattering chamber with turbo pump all the time.
- Jim added Lakeshore Cernox temperature sensors at various heights.
- Chris requested that they be removable, to replace defective ones.
- Chris recommends the Lakeshore Model 218 8-channel temperature monitor read-out unit.
- System should be able to liquefy helium-4, taking it down to 3 K.
- Jim will look into adding a relief tube to by-pass normal feed in case of boil off of target liquid.