Difference between revisions of "March 27, 2013 Tracking CDC/FDC"
From GlueXWiki
(→Hardware Agenda) |
(→Hardware Agenda) |
||
Line 20: | Line 20: | ||
# No Cost Extension to Contract?? | # No Cost Extension to Contract?? | ||
# Installation Details | # Installation Details | ||
− | ## Based on the last installation meeting, it became clear that the FDC installation could move forward to parallel the electronics installation. Discussion of this point | + | ## Based on the last installation meeting, it became clear that the FDC installation could move forward to parallel the electronics installation. Discussion of this point prior to the Friday meeting. |
− | prior to the Friday meeting. | + | |
== Minutes == | == Minutes == |
Revision as of 09:01, 26 March 2013
Meeting Time and Place
Wednesday March 27, 2013 at 11:00am At Jefferson Lab, the meeting will be held in F326
Connections
To connect from the outside, please use ESNET
- ) ESNET: 8542553
- )To connect by telephone, dial:
- You can look up toll-free number at http://www.readytalk.com/intl
- US and Canada: (866)740-1260 (toll free)
- International: (303)248-0285 (toll call)
- enter access code followed by the # sign: 3421244#
Hardware Agenda
- Announcement
- FDC Update
- CDC Update
- No Cost Extension to Contract??
- Installation Details
- Based on the last installation meeting, it became clear that the FDC installation could move forward to parallel the electronics installation. Discussion of this point prior to the Friday meeting.