Difference between revisions of "Minutes-4-4-2013"
From GlueXWiki
Line 8: | Line 8: | ||
#* Plans for practicing at Blue Crab | #* Plans for practicing at Blue Crab | ||
# Engineering (Bill) | # Engineering (Bill) | ||
− | #* Cooling system status | + | #* Cooling system status [http://www.jlab.org/Hall-D/detector/fdc/drawings/FLOW_CALIBRATION_ASSEMBLY.PNG] |
# Electronics (Chris, Nick) | # Electronics (Chris, Nick) | ||
# Tests at EEL126 [https://halldweb1.jlab.org/elog-halld/FDC FDC E-log] (Beni) | # Tests at EEL126 [https://halldweb1.jlab.org/elog-halld/FDC FDC E-log] (Beni) |
Revision as of 12:18, 4 April 2013
April 4, 2013 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Package #3 repair
- Installation (Lubomir, Bill)
- Engineering (Bill)
- Cooling system status [4]
- Electronics (Chris, Nick)
- Tests at EEL126 FDC E-log (Beni)
- Other