Difference between revisions of "Minutes-4-4-2013"

From GlueXWiki
Jump to: navigation, search
Line 8: Line 8:
 
#* Plans for practicing at Blue Crab  
 
#* Plans for practicing at Blue Crab  
 
# Engineering (Bill)
 
# Engineering (Bill)
#* Cooling system status
+
#* Cooling system status [http://www.jlab.org/Hall-D/detector/fdc/drawings/FLOW_CALIBRATION_ASSEMBLY.PNG]
 
# Electronics (Chris, Nick)
 
# Electronics (Chris, Nick)
 
# Tests at EEL126 [https://halldweb1.jlab.org/elog-halld/FDC FDC E-log] (Beni)
 
# Tests at EEL126 [https://halldweb1.jlab.org/elog-halld/FDC FDC E-log] (Beni)

Revision as of 12:18, 4 April 2013

April 4, 2013 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Package #3 repair
  2. Installation (Lubomir, Bill)
    • Cable installation: Rich's models [1], [2], [3]
    • Plans for practicing at Blue Crab
  3. Engineering (Bill)
    • Cooling system status [4]
  4. Electronics (Chris, Nick)
  5. Tests at EEL126 FDC E-log (Beni)
  6. Other