Difference between revisions of "Minutes-4-11-2013"

From GlueXWiki
Jump to: navigation, search
(Created page with "April 4, 2013 FDC meeting = Agenda = # Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_April_4_2013.xlsx Construction Tracking] (Dave) #* Package...")
 
Line 8: Line 8:
 
#* Plans for practicing at Blue Crab  
 
#* Plans for practicing at Blue Crab  
 
# Engineering (Bill)
 
# Engineering (Bill)
#* Cooling system test [http://www.jlab.org/Hall-D/detector/fdc/drawings/modified_flow_model.pdf], [http://www.jlab.org/Hall-D/detector/fdc/drawings/flow_model_additions.PNG], [http://www.jlab.org/Hall-D/detector/fdc/drawings/FLOW_CALIBRATION_ASSEMBLY.PNG]
+
#* Cooling system tests
 
# Electronics (Chris, Nick)
 
# Electronics (Chris, Nick)
 
# Tests at EEL126 [https://halldweb1.jlab.org/elog-halld/FDC FDC E-log] (Beni)
 
# Tests at EEL126 [https://halldweb1.jlab.org/elog-halld/FDC FDC E-log] (Beni)

Revision as of 11:46, 10 April 2013

April 4, 2013 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Package #3 repair
  2. Installation (Lubomir, Bill)
    • Cable assignemt
    • Plans for practicing at Blue Crab
  3. Engineering (Bill)
    • Cooling system tests
  4. Electronics (Chris, Nick)
  5. Tests at EEL126 FDC E-log (Beni)
  6. Other