Difference between revisions of "Minutes-4-11-2013"
From GlueXWiki
Line 6: | Line 6: | ||
# Installation (Lubomir, Bill) | # Installation (Lubomir, Bill) | ||
#* Channel assignment: [http://www.jlab.org/Hall-D/detector/fdc/documents/Channel_Assignments_FDC.xlsx rack's side (Fernando)], [http://www.jlab.org/Hall-D/detector/fdc/documents/FDC_cabel_assignment.xls signal cables detector side (Vlad's scheme)], [http://www.jlab.org/Hall-D/detector/fdc/documents/FDC_LV_cable_assignment.xls LV cables detector side (Vlad's scheme)] | #* Channel assignment: [http://www.jlab.org/Hall-D/detector/fdc/documents/Channel_Assignments_FDC.xlsx rack's side (Fernando)], [http://www.jlab.org/Hall-D/detector/fdc/documents/FDC_cabel_assignment.xls signal cables detector side (Vlad's scheme)], [http://www.jlab.org/Hall-D/detector/fdc/documents/FDC_LV_cable_assignment.xls LV cables detector side (Vlad's scheme)] | ||
+ | #* Schedule [http://www.jlab.org/Hall-D/detector/fdc/installation/FDC_install5.jpg latest version] | ||
#* Plans for practicing at Blue Crab | #* Plans for practicing at Blue Crab | ||
# Engineering (Bill) | # Engineering (Bill) |
Revision as of 18:14, 10 April 2013
April 4, 2013 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Package #3 repair
- Installation (Lubomir, Bill)
- Channel assignment: rack's side (Fernando), signal cables detector side (Vlad's scheme), LV cables detector side (Vlad's scheme)
- Schedule latest version
- Plans for practicing at Blue Crab
- Engineering (Bill)
- Cooling system tests
- Electronics (Chris, Nick)
- Tests at EEL126 FDC E-log (Beni)
- Other