Difference between revisions of "Minutes-4-11-2013"
From GlueXWiki
Line 1: | Line 1: | ||
− | April | + | April 11, 2013 FDC meeting |
= Agenda = | = Agenda = | ||
− | # Production [http://www.jlab.org/Hall-D/detector/fdc/production/ | + | # Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_April_11_2013.xlsx Construction Tracking] (Dave) |
#* Package #3 repair | #* Package #3 repair | ||
# Installation (Lubomir, Bill) | # Installation (Lubomir, Bill) |
Revision as of 11:12, 11 April 2013
April 11, 2013 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Package #3 repair
- Installation (Lubomir, Bill)
- Channel assignment: rack's side (Fernando), signal cables detector side (Vlad's scheme), LV cables detector side (Vlad's scheme)
- Schedule latest version
- Plans for practicing at Blue Crab
- Engineering (Bill)
- Cooling system tests
- Electronics (Chris, Nick)
- Tests at EEL126 FDC E-log (Beni)
- Other