Difference between revisions of "Minutes-4-25-2013"
From GlueXWiki
Line 12: | Line 12: | ||
#* Cooling system tests | #* Cooling system tests | ||
# Electronics (Chris, Nick) | # Electronics (Chris, Nick) | ||
− | # Full electronics tests [https://halldweb1.jlab.org/elog-halld/FDC FDC E-log] | + | # Full electronics tests [https://halldweb1.jlab.org/elog-halld/FDC FDC E-log] (Beni) |
# Other | # Other | ||
Revision as of 17:31, 24 April 2013
April 25, 2013 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Third package status
- Spare package
- Corrosion tests at MePhi: results, [1], [2], [3], [4], [5], [6], [7]
- Installation (Lubomir, Bill)
- FDC installation document
- Practicing at Blue Crab
- Engineering (Bill)
- Cooling system tests
- Electronics (Chris, Nick)
- Full electronics tests FDC E-log (Beni)
- Other