Difference between revisions of "Minutes-5-9-2013"

From GlueXWiki
Jump to: navigation, search
Line 8: Line 8:
 
#* FDC installation [http://www.jlab.org/Hall-D/detector/fdc/installation/FDC_installation.pdf document]  
 
#* FDC installation [http://www.jlab.org/Hall-D/detector/fdc/installation/FDC_installation.pdf document]  
 
# Engineering (Bill)
 
# Engineering (Bill)
#* Cooling system status
+
#* Cooling system test
 
# Electronics (Chris, Nick)
 
# Electronics (Chris, Nick)
 
# Full electronics tests [https://halldweb1.jlab.org/elog-halld/FDC FDC E-log] (Beni)
 
# Full electronics tests [https://halldweb1.jlab.org/elog-halld/FDC FDC E-log] (Beni)

Revision as of 17:58, 8 May 2013

May 9, 2013 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Spare package status
  2. Update on the corrosion test at MePhi (Lubomir)
  3. Installation (Lubomir)
  4. Engineering (Bill)
    • Cooling system test
  5. Electronics (Chris, Nick)
  6. Full electronics tests FDC E-log (Beni)
  7. Other