Difference between revisions of "Minutes-8-22-2013"
From GlueXWiki
Line 3: | Line 3: | ||
= Agenda = | = Agenda = | ||
# Installation preparations [http://www.jlab.org/Hall-D/detector/fdc/installation/FDC_installation.pdf] | # Installation preparations [http://www.jlab.org/Hall-D/detector/fdc/installation/FDC_installation.pdf] | ||
+ | #* Mechanical | ||
+ | #* Gas system | ||
+ | #* Controls: LV, HV, gas | ||
+ | #* Testing: cables, trigger, DAQ | ||
# Engineering (Bill) | # Engineering (Bill) | ||
# Electronics (Chris, Nick) | # Electronics (Chris, Nick) |
Revision as of 11:51, 22 August 2013
August 22, 2013 FDC meeting
Agenda
- Installation preparations [1]
- Mechanical
- Gas system
- Controls: LV, HV, gas
- Testing: cables, trigger, DAQ
- Engineering (Bill)
- Electronics (Chris, Nick)
- Tests at EEL126 (Beni)
- Other