Revision as of 11:56, 22 August 2013
August 22, 2013 FDC meeting
Agenda
- Installation preparations [1]
- Mechanical: infrastructure, survey, cooling system, AC
- Electronics: crates, modules, LV, HV
- Gas system
- Controls: LV, HV, gas
- Testing: cables, trigger, DAQ
- Engineering (Bill)
- Electronics (Chris, Nick)
- Tests at EEL126 (Beni)
- Other